Showing posts with label clamp. Show all posts
Showing posts with label clamp. Show all posts
Monday, August 22, 2016
Floors Glue Up shaping sheer clamp
One small sentence in the instructions couldn't take three days...could it?!! But yep, gluing in the floors is quite time consuming so by the time I had refined their fitting and drilled for the screws, it was quite a slow procedure.

Here you can see the floors being epoxied to the hull. A large screw secures it at the trunk down into the keelson, while further smaller screws are driven up from outside the hull at the plank laps



The finished result cooking under the infrared panel to counter the unseasonable arctic weather we are experiencing.

Meanwhile, I made up a camber template to shape the sheers and the top of the bulkhead. The camber is specified as a 2" rise over 6'. 
I found it a good idea to mark the topside of the template as it is easy to have it the wrong side up....which might have been the reason for my flattened sheer-clamp!!
Subscribe to:
Posts (Atom)