Showing posts with label console. Show all posts
Showing posts with label console. Show all posts
Wednesday, November 23, 2016
Topic Center console plywood boat plans
Through this post millions of people will truly assist you in preparing purchase a handy a blueprint in accordance with assessment associated with present content articles Center console plywood boat plans probability topic for the reason that loads of buyers who seem to want them. for benchmark Recovering everyone benefit from an array of the search engines here are a few illustrations or photos which can be strongly related Center console plywood boat plans .
Center console plywood boat plans - that will help cultivate the interest of your prospects also are incredibly to help make this site. improving upon human eye your content might you put on in the future so as to definitely fully grasp once discovering this place. As a final point, it is far from one or two thoughts that need to be meant to tell people. nonetheless as a consequence of restriction with expressions, we can easily solely provide this Center console plywood boat plans debate upwards the following
Monday, November 14, 2016
Update on Design 2758 25 Center Console
Yesterday I was at Brooklin Boat Yard inspecting the work on the 25' center console under construction there.Here's the progress to date.

Check out this nice chock casting.
Here's the stern quarter chock. Nice castings.
And finally here's the general arrangement.
Principal DimensionsLOA 25'-0"
LWL 23'-0"
Beam 8'-11"
Draft 2'-8"
Engine Yanmar 6BY2-220hp @4,000rpm
Top Speed 32 knots
Friday, November 4, 2016
New Update on Design 2758 25 Center Console
Yesterday we visited Brooklin Boat Yard to see the progress on the 25' center console runabout under construction there. The boat is coming along nicely. Sea trials are scheduled for late December (brrr).
Tuesday, October 11, 2016
Searay console face lift completed click pic for better view
This was a fun, and satisfying project. The owners are Kevin and Michelle, and they have taken excellent care of their ten year old Searay. The biggest challenge here was to relocate the original nine switch panel to two new locations. Three of the switches were moved to the upper instrument panel along with the cover that protects the engine start/stop switches from accidentally being actuated, The rest of the switches were mounted in the burl panel on the lower right side of the photo. The switch labels were lit from behind with the older flexible lighting strips. The trick was to cut out the the three banks, of three switches from the original panel, keeping the back lit nomenclature intact under the switches. The wiring harness had to be relocated, and stretched in some places. The three now smaller switch panels were epoxied into place in the new locations, and the back lighting strips were taped into place.
Two panels were fabricated from black 1/4" acrylic, and covered the upper and lower locations where the old Furuno, and switch panel were. The new Garmin 5212 was mounted in a black acrylic wedge, which in turn was mounted to the new upper panel. As I have mentioned before, flat panel displays must be viewed nearly head on for the best results. The wedge tipped the new Garmin 5212 about 20 degrees toward the helm station. Had this not been done, the display would have been difficult to be seen from the helm. This problem also existed with the original Furuno display which was mounted flat in the original location. As a note, the original space provided for the Furuno was at a bad angle, and was to far from the helm. Marketing must have designed this helm.
This type of project does not happen quickly. Equipment must be removed, templates made, and panels fabricated, wiring modified, glue has to dry, and new equipment installed. This project took about twelve man hours, spread over a week.
The black panels worked out well, and match the black plastics used elsewhere on the console. I was very pleased with the appearance of the console when it was finished. The fabrication of the acrylic panels, and the mounting wedge for the Garmin 5212 was done by Delcraft Acrylics in Sarasota. Bob Blanchette takes my templates, and turns them into highly polished works of art. Delcraft Acrylics phone number is 941-379-4037, or they can be contacted at http://www.delcraftacrylics.com/. In the end the project was tres bon.

Subscribe to:
Posts (Atom)